Supporting Complex Construction Delivery at Curtin University Building 316

Construction & EngineeringConsulting

CURTIN UNIVERSITY BUILDING 316 PROJECT OVERVIEW

Curtin University is constructing Building 316 at its Bentley campus – a major new facility for the Faculty of Science and Engineering. The building will house the John de Laeter Centre and the WA School of Mines: Minerals, Energy and Chemical Engineering.

RM Surveys was engaged by Lendlease to provide survey support from early design through construction. The project involves a large and evolving construction scope, including new building works, upgrades to services and surrounding road infrastructure.

RM Surveys appointed Andrew Ferguson as the dedicated Project Surveyor for Building 316. Andrew acts as the day-to-day point of contact for the builder, subcontractors and wider project team, coordinating survey requirements, reviewing drawings and calculations, planning work and resolving issues as they arise.

With a consistent project lead and access to RM Surveys’ broader construction, Utility Mapping, Geospatial and Dimensional Control teams, the project has one point of coordination across multiple survey requirements.

INTEGRATED SURVEY SUPPORT FOR A COMPLEX CAMPUS BUILD

WHAT WE DELIVERED

CONSTRUCTION SURVEY AND SET-OUT
CLASS A & B UTILITY MAPPING
INTEGRATED SPATIAL DATA FOR DESIGN
DRONE PROGRESS SURVEYS
LASER SCANNING
ROOF TRUSS VERIFICATION BEFORE DELIVERY

CURTIN UNIVERSITY BUILDING 316 PROJECT OUTCOMES

DEDICATED PROJECT LEADERSHIP

With Andrew Ferguson as the dedicated project surveyor, Lendlease had a consistent point of contact who understood the site and coordinated RM Surveys’ wider expertise. This approach helped resolve design issues early, respond to changing requirements and keep construction moving.

One project surveyor throughout delivery

Andrew Ferguson, RM Surveys Senior Surveyor, has led the survey component from project commencement, providing continuity across the site, programme, drawings and evolving construction requirements.

Current information confirmed before roadworks proceeded

During road installation works, Andrew identified a risk and suggested that works shouldn’t proceed using superseded design information. He confirmed the current design with consultants and communicated the update to site personnel and machine operators.

Reduced risk of rework and delays

With our Project Surveyor always on site, Andrew is confirming the current design and highlighting potential issues before works proceed. This has helped avoid incorrect installation, potential rework, additional plant and labour costs, and programme delays.

Multiple RM Surveys services coordinated through one lead

Construction Surveying, Utility Mapping, Geospatial, laser scanning and Dimensional Control support were coordinated through the project surveyor, reducing the need for the client to manage separate providers.

Capacity matched to project demand

As construction activity increased, RM Surveys scaled its resourcing to meet site requirements, with up to six construction surveyors, two Utility Locators and a Geospatial surveyor, supporting the project at peak.

Compliance supported from fieldwork to final delivery

With the ever-increasing HSQE and compliance requirements and compliance requirements for construction projects, RM Surveys installed services on site. Maintaining this coordinated record gave the project team the evidence needed to support site works, dig permits, verification and handover at project completion.

Andrew has done a fantastic job coordinating our work on Building 316 and supporting the site team throughout the project. When I caught up with our clients, they spoke highly of him and his work on site

Mat Armstrong | Manager – Construction, RM Surveys
Background Image

A DEDICATED PROJECT SURVEYOR FROM DESIGN THROUGH CONSTRUCTION

A consistent point of contact with the project knowledge to resolve issues and the team behind him to respond as requirements change.

Building 316 has required close coordination across different construction stages, disciplines and project stakeholders. Andrew’s role goes beyond completing survey tasks: he reviews drawings and calculations, plans work with site teams, creates RFIs, supports other RM Surveys departments and follows through on issues affecting delivery.

This continuity is particularly valuable on a project of this scale. Rather than repeatedly briefing new people, Lendlease and its subcontractors have a consistent survey contact who understands the history of the project, current priorities and the relationship between different work packages.

When additional input is required, Andrew can draw on the wider RM Surveys team while maintaining clear communication with the client and site team. This gives the project access to specialist expertise and additional resources without losing the benefit of an established on-site point of contact.

 

Other Projects

View all projects
project image
1

Perth Zoo Gibbon Crossing: Spatial Data For Elevated Habitat Design

RM Surveys proudly supported the design and delivery of Perth Zoo’s Gibbon Crossing- Australia’s first immersive gibbon habitat, officially opened in June 2025. This exhibit is part of Perth Zoo’s $51 million Master Plan focused on species-first design.

We were engaged to deliver early-stage spatial data to inform design and construction. Our Geospatial and Utility Mapping (UM) teams captured accurate, high-resolution data in a high-traffic, sensitive environment. Tree height and canopy spread were especially critical to ensure habitat safety and functionality.

View more
project image
2

Surveying the Elizabeth Quay Pedestrian Bridge

The Elizabeth Quay Pedestrian Bridge is one of the centrepieces of the new precinct connecting Perth City to the Swan River.

With RM Surveys’ experience in the fabrication and erection of steel structures, they were chosen as the project surveyors for the construction and erection of this complex and visually stunning structure.

View more
project image
3

How RM Surveys Helped Avoid a Factory Return for a Damaged Pilatus Jet

In October 2025, RM Surveys was engaged at Adelaide Airport to support the repair of a damaged Pilatus private jet. The aircraft had sustained structural damage around the rudder assembly.

The manufacturer needed to assess whether the rudder axis alignment could be verified and corrected in situ, rather than returning the aircraft to the factory for validation on a factory jig. This had not been attempted before on this aircraft type.

The objective was to confirm the rudder alignment to factory tolerances on-site, remove the need for a return to the manufacturer, and reduce downtime so the aircraft could get back in the air quickly.

View more