RM Surveys delivered a complete, integrated spatial dataset combining Class A utility mapping with geospatial survey data, structured for direct use in design, construction and asset management.
Deliverables included:
- Class A (QLA) locating of all underground utilities, including important infrastructure in the Kewdale area
- Above and below ground features captured in a single, sign-coordinated dataset
- Positional data accurate to ±50mm, a significant reduction from standard tolerance levels of ±300mm to ±500mm
- Proposed pipeline route incorporated into the dataset with clash point analysis at the target installation depth
- Final deliverable formatted for direct use in design software and asset management workflows
All data was provided in a format suitable for design coordination, stakeholder presentation and ongoing infrastructure planning.

