Coordinated Survey Delivery at Optus Stadium

ConstructionConstruction & Engineering

OPTUS STADIUM PROJECT OVERVIEW

RM Surveys supported Multiplex throughout the construction of Perth Stadium (now Optus Stadium), providing integrated surveying services across the stadium and surrounding precinct from December 2014 to February 2018.

The project involved extensive ground improvement, structural piling and complex construction works, alongside the delivery of surrounding transport connections, services and public infrastructure. Located beside the Swan River, changing ground conditions presented significant challenges for maintaining accurate survey control.

RM Surveys delivered cadastral and topographic surveys, construction set-out, structural monitoring, laser scanning, dimensional verification and BIM-integrated spatial data. Our team also coordinated underground services information across the precinct, supporting designers and contractors throughout construction.

Our involvement continues today through structural monitoring, utility mapping and survey support for major events, demonstrating the value of integrated surveying expertise throughout an asset’s lifecycle.

INTEGRATED SURVEY SUPPORT ACROSS THE STADIUM AND PRECINCT

WHAT WE DELIVERED

EARLY WORKS AND TOPOGRAPHIC SURVEYS
PILING AND CONSTRUCTION SET-OUT
SURVEY CONTROL AND STRUCTURAL MONITORING
LASER SCANNING AND BIM INTEGRATION
PRECINCT-WIDE SERVICES COORDINATION
ONGOING ASSET AND EVENT SURVEY SUPPORT

OPTUS STADIUM PROJECT OUTCOMES

COORDINATED SURVEY DELIVERY AT SCALE

With our project surveyors managing survey delivery and consistent site expertise, Multiplex had coordinated survey support throughout construction. A substantial on-site team, reliable spatial control and integrated project data helped contractors navigate complex construction requirements across the stadium and wider precinct.

Reliable Control in Changing Conditions

Extensive ground improvement works affected survey reference points. RM Surveys continually verified and maintained site control, providing reliable positioning information throughout construction.

BIM-Integrated Construction Verification

Survey and laser scanning data were integrated into the BIM model, enabling comparison against design and providing accurate as-constructed information for subsequent works.

Coordinated Underground Services Information

Weekly updates to underground services models gave designers and contractors current information about installed infrastructure, helping them coordinate new works around existing constraints.

Precise Set-Out Across Multiple Work Packages

From piling and structural construction to surrounding transport infrastructure, RM Surveys supported accurate set-out and verification across the wider development.

Capacity matched to project demand

With 6-8 RM Surveys surveyors on site at any given time and 20 at peak, our team supported concurrent work packages while maintaining consistent coordination and project knowledge.

Continued Support Beyond Construction

RM Surveys continues to support stadium operations through structural monitoring, utility mapping and survey set-out for major events, extending our involvement beyond construction.

It’s not often you get to work on a project that becomes such a big part of your own city. We had a fantastic team involved in Perth Stadium, from the early works right through to completion, and we’re still supporting it today. It’s something I’ll always be proud to have been part of.

Bjorn Bernhardt | General Manager – Business Development, RM Surveys
Background Image

CONSISTENT SITE KNOWLEDGE. COORDINATED DELIVERY AT SCALE.

A dedicated project team with the knowledge, resources and technical expertise to manage changing requirements across one of Western Australia’s largest construction projects.

Paul Wilmshurst was involved in the stadium project from its earliest stages through to the completion of construction, developing detailed knowledge of the site, control network and evolving construction requirements. His continuity made him a trusted source of project knowledge throughout delivery.

At this scale, survey support required more than a single dedicated surveyor. RM Surveys maintained a substantial on-site presence, typically with six to eight surveyors, supported by wider technical expertise, and up to twenty on site at the project’s peak.

As Project Manager, Bjorn Bernhardt provided a central point of coordination for Multiplex and its subcontractors, overseeing survey requirements and the management of spatial information across the wider precinct.

This combination of consistent site knowledge and coordinated project leadership helped maintain reliable survey data, respond to changing requirements and support multiple contractors working across a complex construction programme.

Other Projects

View all projects
project image
1

Perth Zoo Gibbon Crossing: Spatial Data For Elevated Habitat Design

RM Surveys proudly supported the design and delivery of Perth Zoo’s Gibbon Crossing- Australia’s first immersive gibbon habitat, officially opened in June 2025. This exhibit is part of Perth Zoo’s $51 million Master Plan focused on species-first design.

We were engaged to deliver early-stage spatial data to inform design and construction. Our Geospatial and Utility Mapping (UM) teams captured accurate, high-resolution data in a high-traffic, sensitive environment. Tree height and canopy spread were especially critical to ensure habitat safety and functionality.

View more
project image
2

Surveying the Elizabeth Quay Pedestrian Bridge

The Elizabeth Quay Pedestrian Bridge is one of the centrepieces of the new precinct connecting Perth City to the Swan River.

With RM Surveys’ experience in the fabrication and erection of steel structures, they were chosen as the project surveyors for the construction and erection of this complex and visually stunning structure.

View more
project image
3

How RM Surveys Helped Avoid a Factory Return for a Damaged Pilatus Jet

In October 2025, RM Surveys was engaged at Adelaide Airport to support the repair of a damaged Pilatus private jet. The aircraft had sustained structural damage around the rudder assembly.

The manufacturer needed to assess whether the rudder axis alignment could be verified and corrected in situ, rather than returning the aircraft to the factory for validation on a factory jig. This had not been attempted before on this aircraft type.

The objective was to confirm the rudder alignment to factory tolerances on-site, remove the need for a return to the manufacturer, and reduce downtime so the aircraft could get back in the air quickly.

View more